How Long Does a Subclass 820 Partner Visa Take? Current Processing Times Explained

Written by
Weiwei Zhang, Principal Lawyer at My Migration Lawyers
Weiwei Zhang
Principal Lawyer
Published
September 11, 2026
8 min read
Reading Time
8 min read
Table Of Contents

Key Takeaways

  • Home Affairs currently decides 50% of subclass 820 applications within 23 months and 90% within 29 months.
  • Those figures are a historical guide, not a commitment. They describe applications already decided, and they change as the Department's caseload changes.
  • The clock runs from lodgement, not from when your evidence is complete. An application lodged thin does not start counting from the day you finish it.
  • A request for further information is the single most common cause of delay, and most of those requests are avoidable.
  • If your current visa expires while you wait, a Bridging Visa A usually keeps you lawful with full work rights, so a long wait does not mean you cannot work.

How long a subclass 820 partner visa takes right now

Home Affairs decides 50% of subclass 820 applications within 23 months and 90% within 29 months. That is the Department's own published guide, taken from its visa processing times tool.

In plain terms, plan for about two years. Half of all applicants wait longer than 23 months, and one in ten waits more than 29 months, which is close to two and a half years.

Those numbers have moved. Figures published earlier in 2026 sat closer to 20 months at the median, and material still circulating online quotes 16 or 17 months. If you are reading a timeframe anywhere other than the Department's own tool, assume it is out of date.

It is also worth being clear about which visa these figures describe. The 23 and 29 month numbers are for the temporary subclass 820 only. The permanent 801 stage is a separate assessment that happens roughly two years after your original lodgement date, and it is not included in these figures. The offshore subclass 309 runs on its own separate timeframe.

What the Department's published figures actually mean

The processing times tool is often misread, and the misreading causes real anxiety.

They are historical, not predictive. The Department calculates them from applications it has already decided. They tell you what happened to other people's files, not what will happen to yours.

They are percentiles, not an average or a maximum. "50% in 23 months" means half of decided applications took 23 months or less. It does not mean most applications are decided at 23 months, and it certainly does not mean yours will be.

They are not a deadline the Department is bound by. There is no legal obligation to decide within the published period, and exceeding it does not give you a remedy or a right of complaint that changes the outcome.

They exclude time attributable to you. Periods where the Department is waiting on your health examination, your police certificates or your response to a request are still wall clock time you experience, but the Department's own framing treats an application awaiting information from the applicant differently from one sitting in a queue.

The practical consequence is that the figures are useful for planning your life, and close to useless for predicting your specific grant date.

Connect with our friendly team

1300 040 300
Or fill in the form & we'll call you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Why some 820 applications take much longer

Applications that run well past the 29 month mark usually share one or more of a small number of features.

A request for further information. This is the most common cause by a wide margin. A case officer opens the file, finds a gap, and writes to you. Even if you respond promptly, the file goes back into a queue. A single request can add months.

Incomplete evidence at lodgement. Related, but distinct. The clock starts when you lodge, not when your application is ready. Lodging early to secure a bridging visa is sometimes the right call, but an application lodged with four months of evidence still to come will be assessed later than one lodged complete.

Schedule 3 issues. If you lodged without holding a substantive visa, the Schedule 3 waiver question is decided before the relationship is properly assessed. That is an extra decision layer, and it takes time.

Character or health referrals. Anything requiring a health waiver, a further medical opinion or a character assessment moves the file out of the standard queue.

Sponsorship complications. Where the sponsorship limitations in reg 1.20J apply and a waiver is needed, the sponsorship approval itself has to be resolved first.

Expired documents. Health examinations and police certificates have a limited validity. On a two year application, documents obtained at lodgement can expire before the decision, and you will be asked to redo them.

What you can do to shorten the wait

You cannot make the Department work faster. You can avoid being the reason it slows down.

Lodge complete. Address all four relationship criteria at lodgement rather than planning to supplement later. An application that gives a case officer no reason to write to you is the fastest application.

Explain the gaps rather than leaving them. If you have lived apart, kept separate finances, or been together a short time, say so and explain why. Silence invites a request for information. An explanation usually does not.

Get the health and police checks done early, but not too early. They have expiry dates. Sequencing matters on a two year timeline.

Respond to any request in full and within time. Some case officers issue only one request before deciding on what is in front of them. A partial response can result in a refusal rather than a further request.

Keep your contact details current in ImmiAccount. A request sent to an old email address still counts as sent.

Keep gathering evidence after you lodge. The permanent 801 stage is assessed on evidence covering the period after lodgement. Building that record as you go is far easier than reconstructing two years later.

What your status is while you wait

Two years is a long time to be in limbo, and the practical questions matter more than the grant date.

If you held a substantive visa when you lodged, you will usually be granted a Bridging Visa A. It takes effect when your current visa expires, keeps you lawful, and generally carries full work rights and study rights. Most onshore applicants keep working throughout.

A Bridging Visa A does not permit travel. If you need to leave Australia, you must apply for a Bridging Visa B before departing, and it carries a limited travel period. Leaving without the right bridging visa can mean you cannot return, and the 820 generally cannot be granted while you are outside Australia.

Check the grant notice rather than assuming. Work rights are not automatic on every bridging visa, and the conditions attached to yours are what govern, not the general position.

The My Migration Lawyers Difference

hand-coins

Affordable Fees

Competitive professional fees make experienced legal representation more accessible.
scale

Complex Matter Capability

Experienced representation when complications arise.
calendar-clock

Instalment Payment Options

Pay professional fees in manageable instalments throughout your matter.
shield-check

Two-Day Cooling-off Period

You receive a two-business-day cooling-off period after signing the costs agreement.

What to do if your application is past the published timeframe

Being outside the 29 month mark is not unusual and it is not, on its own, a sign that something is wrong.

Start by checking ImmiAccount. Confirm that nothing is outstanding, that no request has been issued that you missed, and that your health and police documents have not expired. A surprising number of apparently stalled applications are waiting on the applicant.

If nothing is outstanding, you can make a status enquiry, but expect a general response. A complaint to the Department does not accelerate a decision, and it does not create a review right.

Where an application has gone genuinely silent for a long period with nothing outstanding, there are limited legal avenues concerned with the Department's duty to decide rather than the merits of your case. Those are narrow and rarely the right first step, but they exist.

When the decision comes, it arrives through ImmiAccount rather than by post, and the grant is usually effective immediately. There is no interview stage for most partner visa applications, so in many cases the first substantive contact you have with the Department after lodgement is the decision itself.

Keep a copy of the grant notice. It states the conditions attached to your visa and the date from which the 801 assessment period runs, and you will need both when the permanent stage comes around.

If your application is refused rather than delayed, the position changes entirely and a short, strict deadline starts running. Our page on partner visa refusals explains how that period is calculated.

If you are unsure whether your application is delayed or in trouble, our partner visa lawyers can review the file and tell you which it is. You can book a consultation online.

Frequently Asked Questions

Can I speed up my subclass 820 application?

Not directly. There is no priority processing or expedite request for partner visas, and paying more does not move you up the queue. What you can control is whether the Department has a reason to pause your file. A complete application with the gaps explained, current health and police documents, and a full response to any request is the fastest version of your application.

Does lodging earlier mean I get decided earlier?

Partly. The queue position is set by your lodgement date, so earlier lodgement does mean an earlier place in line. But an incomplete application invites a request for further information, and that can cost more time than you gained. Lodging early to secure a bridging visa can still be the right decision, particularly where your current visa is expiring.

Why does the Department's published time keep changing?

Because it is recalculated from applications recently decided. As the caseload, staffing and application volumes change, so does the figure. It went from around 20 months earlier in 2026 to 23 months, and it will move again. Always check the Department's own processing times tool rather than a published article.

Does the 23 months include the permanent 801 stage?

No. The published figures cover the temporary 820 only. The permanent 801 is assessed separately, roughly two years after your original lodgement date, and it has its own timeframe. The single application charge covers both stages.

Will I hear anything while I wait?

Usually not, unless the Department needs something. Silence is normal and is not a sign of a problem. You will be contacted if a request for information is issued, and again when the application is decided.

Can I work during the 23 months?

Usually yes, if you applied onshore while holding a valid visa. A Bridging Visa A generally carries full work rights once your previous substantive visa expires. Check your bridging visa grant notice, because conditions vary and work rights are not automatic on every bridging visa.

Connect with our friendly team

1300 040 300
Or fill in the form & we'll call you
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Weiwei Zhang, Principal Lawyer at My Migration Lawyers
Weiwei Zhang
Principal Lawyer

Weiwei Zhang is the Principal Lawyer and Managing Director of My Migration Lawyers. My Migration Lawyers is one of Australia's leading immigration law firms, dedicated exclusively to Australian immigration law. The firm represents individuals, families and businesses across all areas of migration law, with particular expertise in complex immigration matters, Partner Visas, Protection Visas, corporate migration, visa refusals, Administrative Review Tribunal reviews, judicial reviews and visa cancellations.

Categories
subclass-820-partner-visa